

- ref CSR00835
- bedrooms 5
- bathrooms 6
- built 470 m²
- terrace 298 m²
- plot 503 m²
- pool Private
- garden Private
- garage Private
- epc In process
Newly built villa for sale in Casablanca, Marbella Golden Mile
This luxury property is situated in a perfectly located urbanization on the Golden Mile, very close to the centre of Marbella and next to the beach called Casablanca. From this quiet and private residential area, we can walk to the beach, the supermarket, international schools, trendy restaurants and all services.
This newly built villa, which is currently under construction, is the result of the perfect combination of signature architecture and modern interior design, which have been carefully selected, to give the comfort that one would require from such a property, including a 5-star spa, a high-tech home automation system and materials such as marble and Negro Marquina stone, while at the same time, we are helping the environment.
The accommodation consists of five bedrooms distributed over 2 levels, while the property has four levels in total. We access the ground floor through a large main entrance where there is a living room with a double height ceiling, with a dining area and a fully equipped kitchen with top of the range appliances. On the first floor there is the master bedroom with dressing room and bathroom en suite, as well as a private terrace. There are two further bedrooms on this level, both with en-suite bathrooms and access to a connected terrace. On the ground floor, there are two further guest bedrooms, both with en-suite bathrooms. Next to these bedrooms is the SPA and a more familiar living area, with a TV room and a gym from where we can enjoy an underground view of the pool while taking advantage of its natural light.
On the top floor, there is a large roof terrace with plenty of outdoor living area including a summer dining area and a bar with BBQ area and kitchen. There is also a large solarium for sunbathing and relaxing by the Jacuzzi. The villa is fully equipped and will be finished in the third quarter of 2021.
Same property is marketed also by